Install: Drgem X Ray Service Manual
Ensure non-condensing relative humidity stays within the 30% to 75% range to prevent high-voltage arcing in the generator.
Drill and anchor the rails into the concrete floor using heavy-duty expansion bolts.
Section 6: Quality Assurance, Radiation Safety, and Field Maintenance drgem x ray service manual install
Move the patient table to its designated position using precision leveling tools.
For systems like the GXR-SD , mechanical assembly follows a specific sequence: Raise the tube stand (e.g., ) and secure it to the floor or ceiling tracks. Ensure non-condensing relative humidity stays within the 30%
Perform an offset calibration (dark current calibration) to map and compensate for any inherent electronic noise in the detector pixels.
Verify the smooth operation of the tabletop floating mechanism and electromagnetic brakes. Tube Support Column or Ceiling Suspension Installation For systems like the GXR-SD , mechanical assembly
Place a water phantom or plexiglass blocks on the table/wall stand to simulate a patient body.
Anchor the table base securely to the floor using the expansion bolts provided in the installation kit.
Perform essential calibrations, including kV and mA calibrations. If kV setting data is lost, a factory-level kV offset may need to be reset to prevent transformer arcing. 5. Final Diagnostic Checks Before the first patient exam, run a full diagnostic suite:
Ensure that changing the thickness of the phantom results in a consistent optical density or pixel value on the digital image. 4. Collimator and Beam Alignment